# Monday, December 10, 2007

State of Dis Repair: End of it All

some photos of the destruction start to finish
www.flickr.com
This is a Flickr badge showing photos in a set called Bathroom Remodel 2007. Make your own badge here.

Where to start? Since I last posted the bathroom has more or less been entirely finished. Once they finally vacated last Thursday (Day 10) I was overjoyed. There was a board game group at work that night so I hung out and played. I got home around 11 PM, before my wife who was out with friends, to find a puddle in the bathroom coming out from under the vanity. I looked and found that the cold water feed valve to the sink was leaking. I sopped up the water; put a deli container underneath and called the landlord to express my displeasure.

So, day 11 - they come back and fix the valve. I didn't bother to tell him that the seal around the new kitchen faucet was crap. I'll fix that on my own.

Saturday morning, day 12, I'm cleaning up and going to put down a bath mat and realize there is a 2" darkening of the floor around the toilet - what granite floors do when they are wet. So I call the landlord figuring there is some water seepage from the base of the toilet into the floor. No visible water just evidence there is moisture there. He comes over and visits. Long story short, today, day 13, the landlord and the contract stop by and fix the tiny leak in the vanity drain, I had also found on Saturday. The Landlord called me today and told me the contractor assures him there is no problem with the toliet. Not that I care, not my building, so whatever. But they did fix the leaky drain in the vanity.

Bottom line I am thoroughly unimpressed with this contractor's work. The obvious problems aside, the work overall is ripe with cut corners and things that I am going to feel compelled to go back over and dress up a bit. I have to look at them every day.

Monday, December 10, 2007 5:14:16 PM (Eastern Standard Time, UTC-05:00)
#    Comments [0] |